Excavation for Mains Replacement Works | Hyde, Manchester
- Cummins Civil Engineering
- 2 days ago
- 1 min read
Client
Location
Hyde, Manchester
Sector
Utilities - Mains Replacement Works
Project Date
July 2025
Description
As a groundworks contractor for Cadent Gas, we carried out a 3 meter excavation to reach a 450mm gas pipe. HV cables were present near the pipe, necessitating a careful and steady process to avoid damage to them. The temporary works being used were designed through our rapid deployment process, working in collaboration with MGF, and can easily be extracted once the project is completed.
Comments