Gas Escape Excavation | Newcastle
- Cummins Civil Engineering
- 2 days ago
- 1 min read
Client
Northern Gas Networks
Location
Newcastle
Sector
Utilities - Mains Connection Works
Project Date
June 2025
Description
After a gas escape on a 30” main (750 mm ) was found, Cummins was called in to carry out an excavation 3.5 meters deep to enable repairs. The excavation included a bank of 6 high voltage cables and a cluster of internet cable ducts, as well as a 12” gas main, inside the excavation.
The excavation required the breakthrough of concrete that was 2.5 meters deep, surrounding the gas main and cables, which was particularly challenging.
📱 Call: 01625 890 619
📧 Email: info@cumminscivilengineering.co.uk
Comments